Skip to main content
Before
After

Cleaning Trial Summary

:: TSR #15-A-174

 

Customer Objective

The customer was looking to improve their cleaning performance, reduce their cleaning costs, eliminate hazardous chemicals and waste and reduce VOCs.

Cleaning Trial Type
Temperature
Aqueous
Temperature
150°F
Industry
Time Required
Industry
OEM Metal Parts Manufacturing
Time Required
15 to 30 minutes
Segment
Substrate
Machine Manufacturing
Steel
Soil
, Oil
Description of Part(s)
Description of Part
Steel plates and hinges
Cleaner Used
Machine Used
Machine Used

Spray Under Immersion Washer (Graymills T12, Graymills T24, SK 81.8 w/SUI)

Post Cleaning
Post Cleaning

Fresh water rinse followed by air pressure drying

Recommendation to Customer
Recommendation

The ArmaKleen Technical Center recommended using 5% by volume ArmaKleen™ 4 in 1 Cleaner at 150°F in a Spray Under Immersion Washer for a minimum of 15 to 30 minutes.