Skip to main content
15a256before.png
Before
15a256after
After

Cleaning Trial Summary

:: TSR #15-A-256

 

Customer Objective

The customer was looking to improve their cleaning performance and automate their cleaning process.

Cleaning Trial Type
Temperature
Aqueous
Temperature
160°F
Industry
Time Required
Industry
OEM Parts Manufacturing
Time Required
15 minutes to 1 hour
Segment
Substrate
Electrical Manufacturing
Aluminum Steel
Soil
Cutting Fluids Oil, Shop Dirt
Description of Part(s)
Description of Part
Plates with screws
Cleaner Used
Machine Used
Machine Used

Spray Washer (JRI TL3, JRI FL250, JRI FL500, Better Engineering G-2000)

Post Cleaning
Post Cleaning

Fresh water rinse followed by air pressure drying.

Recommendation to Customer
Recommendation

The ArmaKleen Technical Center recommended using 5% by volume ArmaKleen™ 4 in 1 Cleaner at 160°F in a Spray Washer for a minimum of 15 minutes to 1 hour.