Skip to main content
Before
After

Cleaning Trial Summary

:: TSR #15-A-250

 

Customer Objective

The customer was looking to improve their cleaning performance, automate their cleaning process and reduce rework and reject rate.

Cleaning Trial Type
Temperature
Aqueous
Temperature
160°F
Industry
Time Required
Industry
Mold manufacturing
Time Required
15 to 30 minutes
Segment
Substrate
Machine Manufacturing
Aluminum
Soil
Aluminum dust Cutting Fluids, Silicone
Description of Part(s)
Description of Part
Mold/plate, plates, connector roller, brace
Cleaner Used
Machine Used
Machine Used

Spray Washer (JRI TL3, JRI FL250, JRI FL500, Better Engineering G-2000)

Post Cleaning
Post Cleaning

Fresh water rinse followed by air pressure drying.

Recommendation to Customer
Recommendation

The ArmaKleen Technical Center recommended using 5% by volume ArmaKleen™ 4 in 1 Cleaner at 160°F in a Spray Washer for a minimum of 15 – 30 minutes.