Skip to main content
Before
After

Cleaning Trial Summary

:: TSR #16-A-049

 

Customer Objective

The customer was looking to improve their cleaning performance, automate their cleaning process, reduce rework and reject rate, clean mixed metals together and reduce cleaning costs.

Cleaning Trial Type
Temperature
Aqueous
Temperature
160°F
Industry
Time Required
Industry
Aerospace Manufacturing
Time Required
0.5-1 hour for both cleaners
Segment
Substrate
Machine Manufacturing
Aluminum Brass Copper Inconel Stainless Steel
Soil
Particulate, Proprietary coating
Description of Part(s)
Description of Part
An assortment of connector parts
Cleaner Used
Machine Used
Machine Used

·         Spray Washer (JRI TL3, JRI FL250, JRI FL500, Better Engineering G-2000

·         Ultrasonic Washer (SK Blackstone 6315)

Post Cleaning
Post Cleaning

Fresh water rinse followed by air pressure drying

Recommendation to Customer
Recommendation

The ArmaKleen Technical Center recommends using a 10% by volume solution of ArmaKleen™ M-Aero at 160°F in a Spray Washer for a minimum of 30 minutes to 1hour or a 10% by volume solution of ArmaKleen™ M-HP-2 at 160°F in a Spray Washer for a minimum of 30 minutes to 1 hour.