Skip to main content
Before
After

Cleaning Trial Summary

:: TSR #18-P-006

 

Customer Objective

Improve cleaning performance and automate cleaning process

Cleaning Trial Type
Temperature
Adhesive
Temperature
160°F
Industry
Time Required
Industry
Coatings Manufacturing
Time Required
24 hours
Segment
Substrate
Chemical Manufacturing
Aluminum Brass Plastic Steel
Soil
JB WELD STEEL A-1OZ TUBE-BLACK (Silicone), SILI-THANE® 803 (Adhesive)
Description of Part(s)
Description of Part
Pipe and connector
Cleaner Used
Machine Used
Machine Used

Spray Under Immersion Washer (Graymills T12, Graymills T24, SK Model 81.8 w/ SUI)

Post Cleaning
Post Cleaning

Threaded areas of the parts were brushed with a stainless steel bristle brush during the fresh water rinse and air pressure dried

Recommendation to Customer
Recommendation

The ArmaKleen Technical Center recommends using a 100% by volume solution of ArmaKleen™ Paint and Ink Remover at 150°F in a Spray-Under Immersion Washer (Model 81.8 with attached spray pump) for a minimum of 24 hours